Schedule is updated dynamically throughout the semester
DATE | TOPIC | READING | OUT | DUE |
---|---|---|---|---|
Fri, Sep 5Associations: univariate | Point estimation | KNNL Ch1-2Points of significance | ||
Tue, Sep 9 | Sampling distribution | KNNL Ch1-2 | Hw1 out | |
Fri, Sep 12 | Inference: Interval estimation | KNNL Ch2Points of significance | ||
Tue, Sep 16 | Inference: Hypothesis testingStatistical powerSample size estimation | KNNL Ch2Points of significanceNature Methods | ||
Fri, Sep 19 | Inference: Hypothesis testingStatistical powerSample size estimation | Proj groups due | ||
Tue, Sep 23 | Inference: Prediction | Points of significanceKNNL Ch2.5-2.6 | ||
Fri, Sep 26 | Correlation model | KNNL Ch2.11 | Hw2 out | |
Tue, Sep 30 | Weighted regression | KNNL Ch11.1 | ||
Fri, Oct 3 | Project proposal | |||
Tue, Oct 7 | BootstrapSimultaneous inference | KNNL Ch11.5KNNL Ch4.1-4.3 | ||
Fri, Oct 10Associations: multivariate | Inference: EstimationInference: Multicollinearity | KNNL Ch5-6KNNL Ch7.6 | Proj proposal due | |
Tue, Oct 14 | Categorical predictors | KNNL Ch8 | ||
Fri, Oct 17 | No class, exam prep (tentative) | |||
Tue, Oct 21 | Midterm exam | |||
Fri, Oct 24Causality: designed | 1- and 2-factor ANOVA | KNNL Ch15-17, Ch19 | Hw3 out | |
Tue, Oct 28 | 1- and 2-factor ANOVA | KNNL Ch15-17, Ch19 | ||
Fri, Oct 31 | 1- and 2-factor ANOVA | KNNL Ch15-17, Ch19 | ||
Tue, Nov 4 | Project interim report | |||
Fri, Nov 7 | Block designsAnalysis of covariance | KNNL Ch21-22 | ||
Tue, Nov 11 | No class, Veterans day | Proj interim report due | ||
Fri, Nov 14Causality: observational | Causal inference | Ref Ch 1,2,4,7 | Hw4 out | |
Tue, Nov 18 | Causal inference | Ref Ch 7,10,11 | ||
Fri, Nov 21 | Causal inference | |||
Tue, Nov 25 | No class, exam prep (tentative) | |||
Fri, Nov 28 | No class, Thanksgiving break | |||
Tue, Dec 2 | Final exam | |||
Fri, Dec 5 | Project presentation | |||
Mon, Dec 8 | Proj report due | |||
Wed, Dec 10 | Proj review due |